Otaraua Multi-Purpose Circuit Needs and Feasibility Assessment

Xyst undertook a Needs and Feasibility study on a proposed multi-purpose circuit, unique to New Zealand due to design specifications meeting the international speed skating requirements whilst also meeting cycling, walking and running event requirements. Assessing the need, Xyst considered the population in the catchment and the growth predictions, the number of potential users given […]

Wellington City Council – Open Space Quality Assessments

As part of the development of a new open space investment strategy for Wellington City, Xyst visited 131 parks and assessed each using our quality assessment tool over a range of factors including community integration, inclusiveness, diversity, regeneration, maintenance and opportunity. An individual scored report was prepared for each site as well as a comprehensive […]

Play Strategy Review

Xyst worked with the client to transition them from a traditional Playground Strategy to a Play Strategy. The Strategy analysed the current state of Napier’s playgrounds, introduced play beyond playgrounds, youth facilities and touched on outdoor exercise equipment and splash pads. Five key outcomes underpin this Strategy.

Morrinsville Recreation Ground

Morrinsville Recreation Ground was described as the jewel with a wide range of users and user groups. The key stakeholders (41) were those who utilised the Morrinsville Recreation Grounds for a particular event or activity, those who have a vested community interest in the space, and Council staff who have involvement at the ground. Consultation […]

Howie Park Concept Plan

Xyst undertook consultation with key stakeholders and the community to understand how the park was used and to identify key issues and opportunities to enhance the park. Consultation included intercept surveys, phone interviews and drop-in sessions. A consultation report was developed, followed by three concept plan options for Council.

Recreation Facilities Utilisation Study

The Xyst team undertook an assessment of the sport and recreation facilities across the Ashburton District, providing key provisions including a gap analysis and trend overview for 17 different sport and recreation activities. To support the analysis, we met with different sport and recreation clubs across the district to understand utilisation of their current facilities, […]

Sports Lighting Assessment

Xyst conducted an evaluation of 372 sports lights in the Waipa District by physically visiting each location to appraise the lights’ condition and evaluate their compliance with relevant lighting standards. A detailed GIS database was established, and a report containing suggestions for enhancement was prepared.

Fiordland National Park – Review of Lighting Regulations

A review of all national, regional and local regulatory policies and rules was undertaken by Xyst. This work was in preparation for making an application to the International Dark Sky Association for dark sky status for Fiordland National Park.

Hetana Street Reserve Classification

Xyst reviewed the background of the proposal and commissioned a land status report and an arborist assessment. We advised Council on the process and prepared the public notification documentation and the hearing and decision reports, and facilitated mana whenua engagement and the hearings.

TIF Round 7 Application – Tulloch Park Toilet and Change Room Development

As part of the Stage 2 development of Tulloch Park in Mataura, Gore District Council wishes to develop a new toilet and change facility to complement the new visitor assets in the park. These assets include a new playground, pump park, fitness circuit along with a new zero-depth splash pad, and refurbished court surfacing. The […]

Westshore Playground Renewal – Scoping and Procurement for Design and Build

Key aspects of the project included: Scope development following community consultation Assessment of exisiting play structures Arrangement of site survey and consenting investigations Development of design guidelines for the playground design and build Procurement of contractors for playground removal (including evaluation) Procurement of a playground design and build contractor (including evaluation) Drafting of contracts Comms […]

Taitua Arboretum Development Plan

25 years on from the gifting of the Taitua Arboretum to the people of Hamilton City and 50 years on from the first tree plantings, the Arboretum’s landscape has changed significantly; the trees have matured, infrastructure has been developed and visitation has increased significantly. The intention was to take a fresh look at the Arboretum, […]