Risk Assessment Artificial Water Features in Reserves
This report is intended as a follow up to our previous report; Artificial Water Features in Recreation Reserves dated 2 August 2023. The original report looked to investigate industry guidelines and/or best-practice standards and methods used for managing safe public access to artificial water features in recreation reserves. This report delves little deeper and looks […]
Whangārei Aquatic Centre Asset Management Practices Review
Xyst supported Smartz in its review of the pool that is run by Sport Northland (SN) and Community Leisure Management (CLM), by providing the asset management element of the project. The Review was commissioned by Whangarei District Council (WDC) with support from SN, and in liaison with CLM. The review was not a formal full-service […]
Wayfinding Signage Installations
Xyst was commissioned by the Mackenzie District Council to project manage the installation of new park, public space, and wayfinding signage throughout the Mackenzie District. As a starting point, our team conducted an inventory of all existing park signage and subsequently prioritised the refurbishment of areas with higher use. Throughout this project, our team collaborated […]
Sportsground Assessment Report
Xyst worked with the New Zealand Sports Turf Institute (NZSTI) to understand the City’s sportsground conditions. Areas requiring capital investment were identified, risks were discussed and recommendations were provided to the client. The recommendations also outlined operational management, renewal and capital improvement costs at a high-level.
Ashburton District Tree Inventory
Xyst collected tree data on all of Ashburton District Council’s (ADC) street and park trees including GPS location, species, maturity, condition and potential risk features. We used a data collection tool developed by ADC that enabled us to upload tree data directly into the Council’s GIS system. Data collection took place over several visits timed […]
Twizel Sports Field Concept Plans
The Mackenzie District Council engaged Xyst’s landscape architects and support staff to conduct a comprehensive analysis and scoping of two reserves for potential development with sports fields. Staff used standard field measurements and setbacks to help optimise the use of each site. Through this process, detailed concept plans were crafted verifying the suitability of each […]
Leamington Domain Masterplan
Xyst worked in partnership with mana whenua to undertake site analysis with key staff and lessees, a two-stage public engagement process and community board and council engagement. This provided a greater understanding of the key design outcomes and priorities for development. It also strengthened Council’s relationships with mana whenua, lessees and the community and their […]
Sports Fields Lease Model Review
Xyst was contracted to complete this piece of work which included desktop analysis, stakeholder consultation and option analysis. For the purpose of this report, only green fields were considered which included sports such as: rugby, touch rugby, football, softball, athletics, lacrosse etc. Exclusions from this report included hard surfaces and specialised surfaces such as tennis […]
Township Contract Performance Auditing
Xyst designed a specialized tool for the Mackenzie District Council, leveraging the Safety Culture iAuditor platform. This tailored solution facilitates the inspection of areas maintained under the Council’s Township Maintenance Contract. Utilising this platform, Xyst conducts monthly inspections of Reserves and Public Spaces, ensuring adherence to the Council’s Townships Contract. The tool incorporates specific questions, […]
Pōmare Park – Detailed Design
The work involved developing the concept plan prepared earlier in conjunction with the local Taitā community, the DHB and other stakeholders in to a detailed construction and tender set. Drawings included the development of a Site Context, General Arrangement, Set Out, Demolition, Earthworks, Level and Drainage, and Planting Plans. Xyst also prepared Planting Schedules and […]
Regional or Joint Cemetery Shared Service Investigation
Xyst prepared a report exploring existing examples of shared cemetery facilities within New Zealand and Australia and discussed the benefits and challenges relevant to the client and their District. The report also provides a high-level breakdown of each surrounding local authority’s current position and an overall conclusion.
Twizel Man Made Hill Development
The Twizel Community requested the transformation of “Man Made Hill”, an untidy mound of spoil from the Ministry of Works days. In response, Xyst crafted a concept plan for review and implementation by the Mackenzie District Council. The project’s primary goals were to engage the community, revegetate the hill, and enhance the existing walking trail. […]