Short Report on Public Toilet Construction Cost Comparisons

Cory Park Toilet Thames Coromandel District Council

Xyst engaged with leading public convenience facility suppliers, requesting costings for similar three-pan facility builds, including inclusions and exclusions for both pending builds and finished projects from the previous two financial years, in order to inform the report.

Wilding Pine Removals

The Mackenzie District Council engaged Xyst to assist with the removal of 60 hectares of wilding conifers (Contorta and Corsican) in a block visible from the Twizel-Tekapo Highway. Xyst’s team worked closely with ECAN and the Council’s Planning Team to identify the appropriate control method. Xyst then contacted multiple contractors to identify rates and procure […]

Marty McGregor

Marty McGregor

Marty has had a varied 20-year career in the Sport and Recreation industry.  He started working for Tasman Rugby in its formative years, managing and growing the community game before moving into Local Government with the Christchurch City Council in 2008.  Working as a Sports Liaison Advisor, Marty worked in the response, recovery, and delivery […]

Pookeno Multi-Purpose Court Lighting

Pokeno Lighting

Xyst undertook preliminary lighting design and specification for a refurbished multi-purpose sports court, along with a technical review of the selected supplier. The outcome was a high quality 350 lux LED lighting scheme using Musco Lighting luminaires that is fully shielded, avoiding light spill for neighbours and protecting the night sky.

Landscape Architecture

We all have access to public parks and open spaces. Landscape Architecture helps ensure they’re safe, accessible and easy to maintain.

Whangārei Aquatic Centre Asset Management Practices Review

Whangarei District Council

Xyst supported Smartz in its review of the pool that is run by Sport Northland (SN) and Community Leisure Management (CLM), by providing the asset management element of the project. The Review was commissioned by Whangarei District Council (WDC) with support from SN, and in liaison with CLM. The review was not a formal full-service […]

Risk Assessment Artificial Water Features in Reserves

Tauranga City Council

This report is intended as a follow up to our previous report; Artificial Water Features in Recreation Reserves dated 2 August 2023. The original report looked to investigate industry guidelines and/or best-practice standards and methods used for managing safe public access to artificial water features in recreation reserves. This report delves little deeper and looks […]

Wayfinding Signage Installations

Xyst was commissioned by the Mackenzie District Council to project manage the installation of new park, public space, and wayfinding signage throughout the Mackenzie District. As a starting point, our team conducted an inventory of all existing park signage and subsequently prioritised the refurbishment of areas with higher use. Throughout this project, our team collaborated […]

Sportsground Assessment Report

Xyst worked with the New Zealand Sports Turf Institute (NZSTI) to understand the City’s sportsground conditions. Areas requiring capital investment were identified, risks were discussed and recommendations were provided to the client. The recommendations also outlined operational management, renewal and capital improvement costs at a high-level.

Ashburton District Tree Inventory

Xyst collected tree data on all of Ashburton District Council’s (ADC) street and park trees including GPS location, species, maturity, condition and potential risk features. We used a data collection tool developed by ADC that enabled us to upload tree data directly into the Council’s GIS system. Data collection took place over several visits timed […]

Twizel Sports Field Concept Plans

Mackenzie District Council - Sports Field Concept Plan

The Mackenzie District Council engaged Xyst’s landscape architects and support staff to conduct a comprehensive analysis and scoping of two reserves for potential development with sports fields. Staff used standard field measurements and setbacks to help optimise the use of each site. Through this process, detailed concept plans were crafted verifying the suitability of each […]