Manapouri Foreshore Vegetation Management Plan

Southland District Council (SDC) was undertaking a review of the Manapouri Foreshore Reserve Management Plan (2003) which provided for height management of vegetation on the reserve. Although some work on vegetation had been carried out, there had been little ongoing height management particularly in the areas identified as “retained/managed bush”. An itemised programme of works […]

Waitaki Public Toilet Performance Assessment

To undertake this work for Waitaki District Council, Xyst used its public toilet performance assessment tool to provide an individual assessment and report for each public toilet complete with photos and an overall performance score. Each toilet was assessed for: • Facility description (materials, gender configuration, location) • Condition (floors, walls, ceiling, fixtures, roof – […]

Waitaki Emergency Response and Contingency Plan

Waitaki District Council

Waitaki District Council contracted Xyst to develop an Emergency Response and Contingency Plan for its parks and open spaces activity. The plan provided a generic risk assessment and response for all parks and identified specific risks and prepared appropriate responses where these could be identified at individual parks. The plan included actions around trees where […]

Minor review of Tapuaeharuru Bay Lakeshore Reserves Management Plan

In 2020 Taupo District Council received a proposal from Taupō Moana Group Holdings Limited (TGMHL) to develop the Hole in One site it occupies on the Taupō lakefront. The application involved further development than what was allowed for under its current operating licence or the operative management plan. Xyst was able to provide advice to […]

Whangarei Open Space review

Whangarei District Council

The open space review included an inventory of all existing Open Space land within the Whangarei District and categorisation of the Open Space land using the New Zealand Recreation Association (NZRA) category framework and an analysis of provision undertaken at the district and community (ward) level. In addition to categorisation of reserve land, the WDC […]

Trail Survey

Yarra Ranges - Trail Survey

In early 2022 Yarra Ranges Council engaged Xyst to undertake a performance assessment of three shared use trails: the Lilydale Lake Trail, the Lilydale to Warburton Rail Trail, and the Yarra Valley Trail. This was a follow-up to an earlier survey carried out in 2019. Performance assessments were conducted in March 2022 using the Yardstick […]

Street Gardens and Street Furniture Levels of Service

Matamata-Piako District Council engaged Xyst to define level of service statements and guidelines at a high level for provision and development of street gardens and street furniture, and more detailed LoS for maintenance. The priority for this project was the public street or road adjacent to the business zones of the Matamata-Piako District, and entrance […]

Yardstick Parks User Surveys

Yardstick Parks User Surveys were developed in around 2008 initially as a paper based intercept survey designed to target park users and measure satisfaction with a range of parks related services and features. The product was initially called Parkcheck and is still known as this by some users. The surveys were taken online in 2015 […]

Bold Park User Satisfaction Review

Xyst completed a comprehensive engagement strategy involving user intercept surveys, obtaining feedback from non-park-users in surrounding areas, and a matching on-line survey to establish an overall satisfaction rating for the Park. In addition, gaps in service provision were identified and reported that would increase the overall satisfaction.

Howie Park Concept Plan

Xyst undertook consultation with key stakeholders and the community to understand how the park was used and to identify key issues and opportunities to enhance the park. Consultation included intercept surveys, phone interviews and drop-in sessions. A consultation report was developed, followed by three concept plan options for Council.

Riverside Park – Consideration of park asset re-establishment

Xyst developed a report taking into consideration the affected park assets, CPTED, implications on the flow of the surrounding park and recommendation for relocation of affected park assets. A range of stakeholders were contacted to inform the report.

Parks Performance Assessments

The purpose of the parks performance assessment was to identify the strengths and weaknesses of each park, from a multi-faceted holistic perspective, and particularly from the users’ perspective. Recommendations to retain, change or assign (where none previously existed) service classifications for each park were made.